track_adopted_work_metric
Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| track_adopted_work_metric [2016/06/16 11:10] – created hpsamios | track_adopted_work_metric [2020/06/04 08:05] (current) – Removed LINKBACK hans | ||
|---|---|---|---|
| Line 8: | Line 8: | ||
| We should watch this number carefully and ask, for example, whether this interruption User Story really needed to be dealt with during this Sprint | We should watch this number carefully and ask, for example, whether this interruption User Story really needed to be dealt with during this Sprint | ||
| or could have waited to the next. If it happens a lot perhaps the Team should considered shorter Sprints so they are more responsive to the business, for example. In other words, it allows the team to have more planned work. | or could have waited to the next. If it happens a lot perhaps the Team should considered shorter Sprints so they are more responsive to the business, for example. In other words, it allows the team to have more planned work. | ||
| - | |||
| - | ~~LINKBACK~~ | ||
| - | ~~DISCUSSION~~ | ||
| {{tag> | {{tag> | ||
/home/hpsamios/hanssamios.com/dokuwiki/data/attic/track_adopted_work_metric.1466100619.txt.gz · Last modified: (external edit)
