User Tools

Site Tools


our_estimates_are_terrible

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Last revisionBoth sides next revision
blog:our_estimates_are_terrible [2016/03/29 07:05] hpsamiosour_estimates_are_terrible [2020/06/10 12:52] – ↷ Page moved from blog:our_estimates_are_terrible to our_estimates_are_terrible hans
Line 5: Line 5:
 One team were concerned enough that they wanted to have a discussion on their estimates and the problems they perceived in their process. In preparation, the Scrum Master prepared a data-set of estimates and resultant actual data so we could base the conversation on data. The data collected included a story-by-story view of the original point estimate provided by the team and the subsequent actual story points recorded by the team on completion of the work. As a result we were able to create the following chart: One team were concerned enough that they wanted to have a discussion on their estimates and the problems they perceived in their process. In preparation, the Scrum Master prepared a data-set of estimates and resultant actual data so we could base the conversation on data. The data collected included a story-by-story view of the original point estimate provided by the team and the subsequent actual story points recorded by the team on completion of the work. As a result we were able to create the following chart:
  
-{{ :blog:estimates-vs-actual.jpg?300 |}}+{{ :blog:estimates-vs-actual.jpg?600 |}}
  
 This is a frequency chart, a useful starting point for this kind of analysis. It shows for each of estimates the team made (bottom set of numbers – 0.5, 1, 2, etc) the number of times the actual result was a particular estimate. So for estimate of “3” there was 24 times that the actual was also 3 (tallest spike on chart), 15 times it was a 2 (to the left of the tallest spike), 11 times it was an 8 (to the right of the tallest spike) and so on. This is a frequency chart, a useful starting point for this kind of analysis. It shows for each of estimates the team made (bottom set of numbers – 0.5, 1, 2, etc) the number of times the actual result was a particular estimate. So for estimate of “3” there was 24 times that the actual was also 3 (tallest spike on chart), 15 times it was a 2 (to the left of the tallest spike), 11 times it was an 8 (to the right of the tallest spike) and so on.
Line 23: Line 23:
   * {{:blog:pointingestimate_analysis.xlsx|Cleaned up spreadsheet }}   * {{:blog:pointingestimate_analysis.xlsx|Cleaned up spreadsheet }}
  
-{{tag>Estimates BlogEntry}}+Note: this posting was originally published [[http://www.hanssamios.com/wordpress/2013/08/27/our-estimates-are-terrible/|in August 2013 on a Wordpress Blog]] 
 + 
 +{{tag>Estimates BlogEntry PresentationIdea}}
  
-~~LINKBACK~~ 
-~~DISCUSSION~~ 
/home/hpsamios/hanssamios.com/dokuwiki/data/pages/our_estimates_are_terrible.txt · Last modified: 2020/06/10 12:55 by hans