how_do_we_control_work-in-progress_wip
Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| how_do_we_control_work-in-progress_wip [2017/02/20 19:25] – created hpsamios | how_do_we_control_work-in-progress_wip [2020/06/10 12:50] (current) – ↷ Links adapted because of a move operation hans | ||
|---|---|---|---|
| Line 21: | Line 21: | ||
| * Establish a cadence and synchronize work on that cadence. Done correctly the cadence will naturally mean that you cannot take on too much work (although note that people / teams will still over-commit.) | * Establish a cadence and synchronize work on that cadence. Done correctly the cadence will naturally mean that you cannot take on too much work (although note that people / teams will still over-commit.) | ||
| * As it is visible, set limits on how much WIP you are willing to take on for this stage. Note that setting a WIP to be the "same as the number of people in the team" just hides the problem - you need to set up a lower constraint so that people really start concentrating on flow. | * As it is visible, set limits on how much WIP you are willing to take on for this stage. Note that setting a WIP to be the "same as the number of people in the team" just hides the problem - you need to set up a lower constraint so that people really start concentrating on flow. | ||
| - | * Aggressively triage the work. See [[blog:how_do_we_deal_with_product_backlog_explosion|How Do We Deal With Product Backlog Explosion? | + | * Aggressively triage the work. See [[how_do_we_deal_with_product_backlog_explosion|How Do We Deal With Product Backlog Explosion? |
| * Ruthlessly prioritize at all levels. Too much WIP at the program level has a tendency to result in too much WIP at the team level. | * Ruthlessly prioritize at all levels. Too much WIP at the program level has a tendency to result in too much WIP at the team level. | ||
| * Only commit when it means something. For example, if you are about to start some work, but have a dependency on another who is not able to do their part for a long time, it makes no sense to start your work now. | * Only commit when it means something. For example, if you are about to start some work, but have a dependency on another who is not able to do their part for a long time, it makes no sense to start your work now. | ||
| Line 29: | Line 29: | ||
| And, again, begin by making WIP visible. | And, again, begin by making WIP visible. | ||
| - | |||
| - | |||
| - | ~~LINKBACK~~ | ||
| - | ~~DISCUSSION~~ | ||
| {{tag> | {{tag> | ||