do_we_put_story_point_estimates_on_a_spike_enabler_story
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Last revisionBoth sides next revision | ||
do_we_put_story_point_estimates_on_a_spike_enabler_story [2022/06/22 12:36] – Added want to know more hans | do_we_put_story_point_estimates_on_a_spike_enabler_story [2022/06/22 12:37] – hans | ||
---|---|---|---|
Line 9: | Line 9: | ||
- As we look ahead beyond the current Iteration, we can use the data generate to build roadmaps and forecasts | - As we look ahead beyond the current Iteration, we can use the data generate to build roadmaps and forecasts | ||
- | This means that Spikes, and everything else, should have an estimate. | + | This means that Spikes, and everything else such as Bugs, should have an estimate. |
====== Want to Know More? ====== | ====== Want to Know More? ====== |
/home/hpsamios/hanssamios.com/dokuwiki/data/pages/do_we_put_story_point_estimates_on_a_spike_enabler_story.txt · Last modified: 2022/06/22 12:40 by hans