 We should watch this number carefully and ask, for example, whether this interruption User Story really needed to be dealt with during this Sprint We should watch this number carefully and ask, for example, whether this interruption User Story really needed to be dealt with during this Sprint
 or could have waited to the next. If it happens a lot perhaps the Team should considered shorter Sprints so they are more responsive to the business, for example. In other words, it allows the team to have more planned work. or could have waited to the next. If it happens a lot perhaps the Team should considered shorter Sprints so they are more responsive to the business, for example. In other words, it allows the team to have more planned work.
- 
-~~LINKBACK~~ 
-~~DISCUSSION~~ 
  
 {{tag>Team Estimates Forecast Points EstimationPractice Metric AdoptedWork}} {{tag>Team Estimates Forecast Points EstimationPractice Metric AdoptedWork}}
/home/hpsamios/hanssamios.com/dokuwiki/data/attic/track_adopted_work_metric.1591132898.txt.gz · Last modified: 2020/06/02 14:21 by 127.0.0.1