how_does_a_team_initially_get_control_of_work
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
how_does_a_team_initially_get_control_of_work [2018/12/05 11:36] – [Want To Know More?] Added dependencies hpsamios | how_does_a_team_initially_get_control_of_work [2020/06/10 12:47] (current) – ↷ Links adapted because of a move operation hans | ||
---|---|---|---|
Line 52: | Line 52: | ||
Again, the idea is that the Team increasingly gets control of their work, and in particular their intake system, so that can structure that process to deliver value faster. As you get control of work you will typically find that more and more work can be planned which provides opportunities for Teams to improve delivery (see [[: | Again, the idea is that the Team increasingly gets control of their work, and in particular their intake system, so that can structure that process to deliver value faster. As you get control of work you will typically find that more and more work can be planned which provides opportunities for Teams to improve delivery (see [[: | ||
- | {{ | + | {{ getting_control_of_work.jpg? |
(Thanks to [[https:// | (Thanks to [[https:// | ||
Line 91: | Line 91: | ||
* [[: | * [[: | ||
* [[How Do We Ensure Critical Work Does Not Get Dropped as We Kick Off Teams?]] | * [[How Do We Ensure Critical Work Does Not Get Dropped as We Kick Off Teams?]] | ||
- | * [[blog:why_should_we_work_harder_to_eliminate_the_effect_of_dependencies|Why Should We Work Harder to Eliminate the Effect of Dependencies? | + | * [[why_should_we_work_harder_to_eliminate_the_effect_of_dependencies|Why Should We Work Harder to Eliminate the Effect of Dependencies? |
Thanks to [[https:// | Thanks to [[https:// |
/home/hpsamios/hanssamios.com/dokuwiki/data/attic/how_does_a_team_initially_get_control_of_work.1544038593.txt.gz · Last modified: 2020/06/02 14:31 (external edit)